Midpoint Solar, LLC is a 50.0 MW battery interconnection project in Hill, Texas with a current status of operational.

50.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameMidpoint Solar, LLC
Queue ID66897_MIDBA
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity50.0 MW
StateTexas
CountyHill
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-06-01
Withdrawn date—
Developer—
Utility / transmission ownerSunraycer Assets I LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata