Midpoint Storage (24INR0138)

Midpoint Storage is a 50.9 MW other interconnection project in Hill, Texas with a current status of operational. It is proposed to connect at 138 KV Tap #3518 BLUM to #237 Blanton.

50.9 MWCapacity
OperationalStatus
HillMarket
OtherTechnology

Project facts

Canonical nameMidpoint Storage
Queue ID24INR0138
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHill
TechnologyOther
Capacity50.9 MW
StateTexas
CountyHill
Point of interconnection138 KV Tap #3518 BLUM to #237 Blanton
Requested (queue) date2021-10-15
Proposed in-service date
Operational date2026-03-13
Withdrawn date
DeveloperMidpoint Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata