MIDTOWN CANYON GAS (1178)

MIDTOWN CANYON GAS is a 507.4 MW gas interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at Talega-Escondido 230 kv line.

507.4 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMIDTOWN CANYON GAS
Queue ID1178
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity507.4 MW
StateCalifornia
CountySan Diego
Point of interconnectionTalega-Escondido 230 kv line
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2015-07-06
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.