Midway 138 kV II (AG2-337 - moved to TC2)

Midway 138 kV II is a 20.0 MW solar interconnection project in Henry, Ohio with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMidway 138 kV II
Queue IDAG2-337 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StateOhio
CountyHenry
Point of interconnection
Requested (queue) date2021-03-25
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-07-01
Developer
Utility / transmission ownerATSI

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata