Midway 138 kV (AH2-215)

Midway 138 kV is a 200.0 MW solar interconnection project in Henry, Ohio with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMidway 138 kV
Queue IDAH2-215
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateOhio
CountyHenry
Point of interconnection
Requested (queue) date2022-03-09
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-02-04
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.