Midway 345 kV III (AG2-515 - moved to TC2)

Midway 345 kV III is a 100.0 MW solar interconnection project in Lucas, Ohio with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMidway 345 kV III
Queue IDAG2-515 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateOhio
CountyLucas
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date2029-07-31
Operational date
Withdrawn date2025-11-28
Developer
Utility / transmission ownerATSI

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata