Midway 345 kV (AG2-358)

Midway 345 kV is a 300.0 MW battery interconnection project in Henry, Ohio with a current status of withdrawn.

300.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameMidway 345 kV
Queue IDAG2-358
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity300.0 MW
StateOhio
CountyHenry
Point of interconnection—
Requested (queue) date2021-03-26
Proposed in-service date2024-11-15
Operational date—
Withdrawn date2024-12-18
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.