Midway Peaking LLC (56639_2)

Midway Peaking LLC is a 69.9 MW gas interconnection project in Fresno, California with a current status of operational.

69.9 MWCapacity
OperationalStatus
CISOMarket
GasTechnology

Project facts

Canonical nameMidway Peaking LLC
Queue ID56639_2
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyGas
Capacity69.9 MW
StateCalifornia
CountyFresno
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2009-05-01
Withdrawn date
Developer
Utility / transmission ownerCalPeak Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata