Miles City 230 kV Substation is a 225.0 MW wind interconnection project in Custer, Montana with a current status of withdrawn. It is proposed to connect at Miles City 230 kV Substation.

225.0 MWCapacity
WithdrawnStatus
MTMarket
WindTechnology

Project facts

Canonical nameMiles City 230 kV Substation
Queue IDGEN-2024-216
Statuswithdrawn
Source statusWITHDRAWN
MarketMT
TechnologyWind
Capacity225.0 MW
StateMontana
CountyCuster
Point of interconnectionMiles City 230 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2027-12-31
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata