Milford 138kV (Y3-054)

Milford 138kV is a 12.0 MW solar interconnection project in Kent, Delaware with a current status of withdrawn.

12.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMilford 138kV
Queue IDY3-054
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity12.0 MW
StateDelaware
CountyKent
Point of interconnection—
Requested (queue) date2013-03-05
Proposed in-service date2014-12-31
Operational date—
Withdrawn date2016-05-16
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.