Milford-Cartanza 230 kV (AG1-087)

Milford-Cartanza 230 kV is a 440.0 MW wind interconnection project in Sussex, Delaware with a current status of withdrawn.

440.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameMilford-Cartanza 230 kV
Queue IDAG1-087
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity440.0 MW
StateDelaware
CountySussex
Point of interconnection—
Requested (queue) date2020-07-31
Proposed in-service date2026-10-31
Operational date—
Withdrawn date2023-09-12
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.