Mill Point Solar II (1231)

Mill Point Solar II is a 100.0 MW other interconnection project in Montgomery, New York with a current status of withdrawn. It is proposed to connect at New Scotland-Marcy 345kV.

100.0 MWCapacity
WithdrawnStatus
EMarket
OtherTechnology

Project facts

Canonical nameMill Point Solar II
Queue ID1231
Statuswithdrawn
Source status0
MarketE
TechnologyOther
Capacity100.0 MW
StateNew York
CountyMontgomery
Point of interconnectionNew Scotland-Marcy 345kV
Requested (queue) date2021-08-17
Proposed in-service date2024-01-31
Operational date
Withdrawn date
DeveloperConnectGen Montgomery County LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata