Mill Point Solar II (C24-336)
Mill Point Solar II is a 100.0 MW other interconnection project in Montgomery, New York with a current status of active. It is proposed to connect at Marcy - New Scotland 345kV, Line 18.
100.0 MWCapacity
ActiveStatus
EMarket
OtherTechnology
Project facts
| Canonical name | Mill Point Solar II |
|---|---|
| Queue ID | C24-336 |
| Status | active |
| Source status | 6 |
| Market | E |
| Technology | Other |
| Capacity | 100.0 MW |
| State | New York |
| County | Montgomery |
| Point of interconnection | Marcy - New Scotland 345kV, Line 18 |
| Requested (queue) date | 2024-10-10 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | ConnectGen Montgomery County LLC |
| Utility / transmission owner | NM-NG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata