Miller Bend Energy Solar (29INR0203)

Miller Bend Energy Solar is a 531.8 MW solar interconnection project in Young, Texas with a current status of operational. It is proposed to connect at Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road.

531.8 MWCapacity
OperationalStatus
YoungMarket
SolarTechnology

Project facts

Canonical nameMiller Bend Energy Solar
Queue ID29INR0203
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketYoung
TechnologySolar
Capacity531.8 MW
StateTexas
CountyYoung
Point of interconnectionTap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road
Requested (queue) date2025-12-17
Proposed in-service date
Operational date2029-12-01
Withdrawn date
DeveloperMiller Bend Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata