Millersburg 69 kV (AH2-222)

Millersburg 69 kV is a 60.0 MW solar interconnection project in N/a, Kentucky with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMillersburg 69 kV
Queue IDAH2-222
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity60.0 MW
StateKentucky
CountyN/a
Point of interconnection—
Requested (queue) date2022-03-09
Proposed in-service date2026-12-31
Operational date—
Withdrawn date2025-01-14
Developer—
Utility / transmission ownerEKPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata