Millhurst-Rt 33 Switch Point 34.5kV is a 11.1 MW solar interconnection project in Monmouth, New Jersey with a current status of withdrawn.

11.1 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMillhurst-Rt 33 Switch Point 34.5kV
Queue IDAB2-111
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity11.1 MW
StateNew Jersey
CountyMonmouth
Point of interconnection
Requested (queue) date2016-04-28
Proposed in-service date2017-04-20
Operational date
Withdrawn date2017-03-27
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata