Millsboro 25kV (AC2-010)

Millsboro 25kV is a 6.0 MW other interconnection project in Sussex, Delaware with a current status of withdrawn.

6.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameMillsboro 25kV
Queue IDAC2-010
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity6.0 MW
StateDelaware
CountySussex
Point of interconnection
Requested (queue) date2016-12-05
Proposed in-service date2018-04-30
Operational date
Withdrawn date2017-03-24
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata