Minco 345 kV Substation (GEN-2015-059)

Minco 345 kV Substation is a 6.3 MW wind interconnection project in Grady County, Oklahoma with a current status of withdrawn. It is proposed to connect at Minco 345 kV Substation.

6.3 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameMinco 345 kV Substation
Queue IDGEN-2015-059
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity6.3 MW
StateOklahoma
CountyGrady County
Point of interconnectionMinco 345 kV Substation
Requested (queue) date2015-10-06
Proposed in-service date
Operational date
Withdrawn date2016-08-29
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata