Grady County County, Oklahoma — Interconnection Projects
The interXdata warehouse tracks 11 interconnection projects in Grady County, Oklahoma, representing 1,529 MW of requested capacity.
11Total projects
1Active
5Operational
5Withdrawn
1,529 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 7 | 818 MW |
| Other | 1 | 580 MW |
| Battery | 3 | 131 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| GEN-2001-025 | GEN-2001-025 | Other | 580.0 MW | withdrawn | Grady County, Oklahoma |
| Tap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV | GEN-2011-029 | Wind | 200.0 MW | withdrawn | Grady County, Oklahoma |
| Minco 345kV | GEN-2007-043 | Wind | 200.0 MW | operational | Grady County, Oklahoma |
| Tap Rush Springs - Marlow 138kV | GEN-2011-050 | Wind | 108.0 MW | operational | Grady County, Oklahoma |
| Cimarron - Lawton Eastside 345kV | GEN-2009-035 | Wind | 102.0 MW | withdrawn | Grady County, Oklahoma |
| Cimarron - Lawton Eastside 345kV | GEN-2009-034 | Wind | 102.0 MW | withdrawn | Grady County, Oklahoma |
| Minco 345kV | GEN-2015-057 | Wind | 100.0 MW | operational | Grady County, Oklahoma |
| Minco 345 kV | GEN-2023-SR18 | Battery | 80.0 MW | operational | Grady County, Oklahoma |
| Minco 345kV Substation | GEN-2026-PR17 | Battery | 40.5 MW | active | Grady County, Oklahoma |
| Lawton East Side-Sunnyside (Terry Road) 345kV | GEN-2015-045 | Battery | 10.3 MW | operational | Grady County, Oklahoma |
| Minco 345 kV Substation | GEN-2015-059 | Wind | 6.3 MW | withdrawn | Grady County, Oklahoma |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Grady County County.