Mineral Basin Solar Power (1080)

Mineral Basin Solar Power is a 401.6 MW solar interconnection project in Clearfield, Pennsylvania with a current status of active. It is proposed to connect at Homer City - Mainesburg 345KV.

401.6 MWCapacity
ActiveStatus
CMarket
SolarTechnology

Project facts

Canonical nameMineral Basin Solar Power
Queue ID1080
Statusactive
Source status10
MarketC
TechnologySolar
Capacity401.6 MW
StatePennsylvania
CountyClearfield
Point of interconnectionHomer City - Mainesburg 345KV
Requested (queue) date2020-08-21
Proposed in-service date
Operational date
Withdrawn date
DeveloperMineral Basin Solar Power, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.