Mineral Basin Solar Power (1080)
Mineral Basin Solar Power is a 401.6 MW solar interconnection project in Clearfield, Pennsylvania with a current status of active. It is proposed to connect at Homer City - Mainesburg 345KV.
401.6 MWCapacity
ActiveStatus
CMarket
SolarTechnology
Project facts
| Canonical name | Mineral Basin Solar Power |
|---|---|
| Queue ID | 1080 |
| Status | active |
| Source status | 10 |
| Market | C |
| Technology | Solar |
| Capacity | 401.6 MW |
| State | Pennsylvania |
| County | Clearfield |
| Point of interconnection | Homer City - Mainesburg 345KV |
| Requested (queue) date | 2020-08-21 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Mineral Basin Solar Power, LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.