Mingo 345kV (GEN-2014-015)

Mingo 345kV is a 300.1 MW wind interconnection project in Lincoln, Colorado with a current status of withdrawn. It is proposed to connect at Mingo 345kV.

300.1 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameMingo 345kV
Queue IDGEN-2014-015
Statuswithdrawn
Source statusWITHDRAWN
MarketCO
TechnologyWind
Capacity300.1 MW
StateColorado
CountyLincoln
Point of interconnectionMingo 345kV
Requested (queue) date2014-06-27
Proposed in-service date
Operational date
Withdrawn date2014-10-24
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata