Minster 69kV (AC1-212)

Minster 69kV is a 19.9 MW battery interconnection project in Auglaize, Ohio with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMinster 69kV
Queue IDAC1-212
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity19.9 MW
StateOhio
CountyAuglaize
Point of interconnection
Requested (queue) date2016-10-31
Proposed in-service date2020-12-31
Operational date
Withdrawn date2020-12-16
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.