MISO Queue Project APP-100087 — Wind in an unlisted county, North Dakota

MISO Queue Project APP-100087 — Wind in an unlisted county, North Dakota is a 202.5 MW wind interconnection project with a current status of withdrawn.

202.5 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project APP-100087 — Wind in an unlisted county, North Dakota
Queue IDAPP-100087
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity202.5 MW
StateNorth Dakota
County
Point of interconnection
Requested (queue) date2025-08-06
Proposed in-service date
Operational date
Withdrawn date2025-09-08
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.