MISO Queue Project E002 — Gas in Pointe Coupee Parish, Louisiana

MISO Queue Project E002 — Gas in Pointe Coupee Parish, Louisiana is a 15.0 MW gas interconnection project in Pointe Coupee Parish, Louisiana with a current status of operational. It is proposed to connect at 500 kV switchyard at Big Cajon II.

15.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project E002 — Gas in Pointe Coupee Parish, Louisiana
Queue IDE002
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity15.0 MW
StateLouisiana
CountyPointe Coupee Parish
Point of interconnection500 kV switchyard at Big Cajon II
Requested (queue) date2013-09-13
Proposed in-service date
Operational date2015-07-13
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.