MISO Queue Project E0038 — Gas in Winnebago, Wisconsin
MISO Queue Project E0038 — Gas in Winnebago, Wisconsin is a 454.8 MW gas interconnection project in Winnebago, Wisconsin with a current status of active. It is proposed to connect at Neevin 138kV Substation.
454.8 MWCapacity
ActiveStatus
MISOMarket
GasTechnology
Project facts
| Canonical name | MISO Queue Project E0038 — Gas in Winnebago, Wisconsin |
|---|---|
| Queue ID | E0038 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Gas |
| Capacity | 454.8 MW |
| State | Wisconsin |
| County | Winnebago |
| Point of interconnection | Neevin 138kV Substation |
| Requested (queue) date | 2025-08-06 |
| Proposed in-service date | 2025-10-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Wisconsin Power and Light Company (WPL) |
| Utility / transmission owner | Wisconsin Power & Light Co |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata