MISO Queue Project G067 — Diesel in Cass, North Dakota

MISO Queue Project G067 — Diesel in Cass, North Dakota is a 2.0 MW diesel interconnection project in Cass, North Dakota with a current status of operational. It is proposed to connect at Unknown.

2.0 MWCapacity
OperationalStatus
MISOMarket
DieselTechnology

Project facts

Canonical nameMISO Queue Project G067 — Diesel in Cass, North Dakota
Queue IDG067
Statusoperational
Source statusoperational
MarketMISO
TechnologyDiesel
Capacity2.0 MW
StateNorth Dakota
CountyCass
Point of interconnectionUnknown
Requested (queue) date2000-11-09
Proposed in-service date2004-05-01
Operational date2004-05-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata