MISO Queue Project G301 — Wind in Osceola, Iowa

MISO Queue Project G301 — Wind in Osceola, Iowa is a 4.0 MW wind interconnection project in Osceola, Iowa with a current status of operational. It is proposed to connect at Sibley - Triboji 69kV.

4.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G301 — Wind in Osceola, Iowa
Queue IDG301
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity4.0 MW
StateIowa
CountyOsceola
Point of interconnectionSibley - Triboji 69kV
Requested (queue) date2003-02-24
Proposed in-service date2003-09-01
Operational date2003-09-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata