MISO Queue Project G354 — Wind in Fond Du Lac, Wisconsin

MISO Queue Project G354 — Wind in Fond Du Lac, Wisconsin is a 80.0 MW wind interconnection project in Fond Du Lac, Wisconsin with a current status of operational. It is proposed to connect at Acadian - Forest Junction 345kV.

80.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G354 — Wind in Fond Du Lac, Wisconsin
Queue IDG354
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity80.0 MW
StateWisconsin
CountyFond Du Lac
Point of interconnectionAcadian - Forest Junction 345kV
Requested (queue) date2003-07-23
Proposed in-service date2009-01-01
Operational date2009-01-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata