MISO Queue Project G503 — Wind in Huron, Michigan is a 158.0 MW wind interconnection project in Huron, Michigan with a current status of operational. It is proposed to connect at Sanduskey - Wyatt 120 kV.

158.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G503 — Wind in Huron, Michigan
Queue IDG503
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity158.0 MW
StateMichigan
CountyHuron
Point of interconnectionSanduskey - Wyatt 120 kV
Requested (queue) date2005-03-14
Proposed in-service date2008-10-01
Operational date2008-10-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.