MISO Queue Project G507 — Wind in Fond Du Lac, Wisconsin is a 68.0 MW wind interconnection project in Fond Du Lac, Wisconsin with a current status of operational. It is proposed to connect at Near intersection of 138kV line X-2 (OHM-MUR), 345kV line W-1 (SFL-EDG), and 345kV line 971L51 (FJT-ADN).
Project facts
| Canonical name | MISO Queue Project G507 — Wind in Fond Du Lac, Wisconsin |
|---|---|
| Queue ID | G507 |
| Status | operational |
| Source status | operational |
| Market | MISO |
| Technology | Wind |
| Capacity | 68.0 MW |
| State | Wisconsin |
| County | Fond Du Lac |
| Point of interconnection | Near intersection of 138kV line X-2 (OHM-MUR), 345kV line W-1 (SFL-EDG), and 345kV line 971L51 (FJT-ADN) |
| Requested (queue) date | 2005-03-11 |
| Proposed in-service date | 2005-11-01 |
| Operational date | 2005-11-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata