MISO Queue Project G510 — Gas in Ozaukee, Wisconsin

MISO Queue Project G510 — Gas in Ozaukee, Wisconsin is a 90.0 MW gas interconnection project in Ozaukee, Wisconsin with a current status of operational. It is proposed to connect at Port Washington, WI.

90.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G510 — Gas in Ozaukee, Wisconsin
Queue IDG510
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity90.0 MW
StateWisconsin
CountyOzaukee
Point of interconnectionPort Washington, WI
Requested (queue) date2005-03-18
Proposed in-service date2005-12-31
Operational date2005-12-31
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata