MISO Queue Project G566d — Wind in Missaukee, Michigan

MISO Queue Project G566d — Wind in Missaukee, Michigan is a 18.0 MW wind interconnection project in Missaukee, Michigan with a current status of operational. It is proposed to connect at Cadillac - Leroy 69 kV.

18.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G566d — Wind in Missaukee, Michigan
Queue IDG566d
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity18.0 MW
StateMichigan
CountyMissaukee
Point of interconnectionCadillac - Leroy 69 kV
Requested (queue) date2006-10-19
Proposed in-service date2008-08-01
Operational date2008-08-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.