MISO Queue Project G712 — Coal in Bowman, North Dakota
MISO Queue Project G712 — Coal in Bowman, North Dakota is a 513.0 MW coal interconnection project in Bowman, North Dakota with a current status of withdrawn. It is proposed to connect at existing unnamed 230 kV transmission line 2 miles south of plant.
Project facts
| Canonical name | MISO Queue Project G712 — Coal in Bowman, North Dakota |
|---|---|
| Queue ID | G712 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Coal |
| Capacity | 513.0 MW |
| State | North Dakota |
| County | Bowman |
| Point of interconnection | existing unnamed 230 kV transmission line 2 miles south of plant |
| Requested (queue) date | 2006-12-11 |
| Proposed in-service date | 2012-10-01 |
| Operational date | — |
| Withdrawn date | 2008-12-01 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata