MISO Queue Project G733 — Nuclear in Callaway, Missouri

MISO Queue Project G733 — Nuclear in Callaway, Missouri is a 1,650.0 MW nuclear interconnection project in Callaway, Missouri with a current status of withdrawn. It is proposed to connect at Callaway Plant Switchyard.

1,650.0 MWCapacity
WithdrawnStatus
MISOMarket
NuclearTechnology

Project facts

Canonical nameMISO Queue Project G733 — Nuclear in Callaway, Missouri
Queue IDG733
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyNuclear
Capacity1,650.0 MW
StateMissouri
CountyCallaway
Point of interconnectionCallaway Plant Switchyard
Requested (queue) date2007-02-01
Proposed in-service date2009-07-01
Operational date
Withdrawn date2010-12-28
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.