MISO Queue Project G744 — Wind in Schuyler, Missouri

MISO Queue Project G744 — Wind in Schuyler, Missouri is a 150.0 MW wind interconnection project in Schuyler, Missouri with a current status of withdrawn. It is proposed to connect at Adair - Appanoose 161kV.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G744 — Wind in Schuyler, Missouri
Queue IDG744
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity150.0 MW
StateMissouri
CountySchuyler
Point of interconnectionAdair - Appanoose 161kV
Requested (queue) date2007-02-20
Proposed in-service date2009-06-15
Operational date
Withdrawn date2009-03-17
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.