MISO Queue Project G773 — Wind in Brown, Wisconsin

MISO Queue Project G773 — Wind in Brown, Wisconsin is a 150.0 MW wind interconnection project in Brown, Wisconsin with a current status of withdrawn. It is proposed to connect at Forest Junction - Lost Dauphin 138kV.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G773 — Wind in Brown, Wisconsin
Queue IDG773
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity150.0 MW
StateWisconsin
CountyBrown
Point of interconnectionForest Junction - Lost Dauphin 138kV
Requested (queue) date2007-03-27
Proposed in-service date2010-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.