MISO Queue Project G809 — Gas in Midland, Michigan

MISO Queue Project G809 — Gas in Midland, Michigan is a 193.0 MW gas interconnection project in Midland, Michigan with a current status of operational. It is proposed to connect at Tittabawassee 345kV Substation.

193.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G809 — Gas in Midland, Michigan
Queue IDG809
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity193.0 MW
StateMichigan
CountyMidland
Point of interconnectionTittabawassee 345kV Substation
Requested (queue) date2007-06-12
Proposed in-service date2009-12-01
Operational date2009-12-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.