MISO Queue Project G847 — Gas in Audrain, Missouri

MISO Queue Project G847 — Gas in Audrain, Missouri is a 62.0 MW gas interconnection project in Audrain, Missouri with a current status of withdrawn. It is proposed to connect at Spencer Creek 345kV substation.

62.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G847 — Gas in Audrain, Missouri
Queue IDG847
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity62.0 MW
StateMissouri
CountyAudrain
Point of interconnectionSpencer Creek 345kV substation
Requested (queue) date2007-08-27
Proposed in-service date2009-06-01
Operational date
Withdrawn date2010-04-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.