MISO Queue Project G947 — Wind in Franklin, Iowa

MISO Queue Project G947 — Wind in Franklin, Iowa is a 99.0 MW wind interconnection project in Franklin, Iowa with a current status of operational. It is proposed to connect at ITCM Whispering Wilows 161kV Substation.

99.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G947 — Wind in Franklin, Iowa
Queue IDG947
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity99.0 MW
StateIowa
CountyFranklin
Point of interconnectionITCM Whispering Wilows 161kV Substation
Requested (queue) date2008-01-14
Proposed in-service date2011-12-01
Operational date2011-12-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata