MISO Queue Project G948 — Wind in Clay, Iowa

MISO Queue Project G948 — Wind in Clay, Iowa is a 249.6 MW wind interconnection project in Clay, Iowa with a current status of withdrawn. It is proposed to connect at Sheldon (Obrien County sub) 345kV.

249.6 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G948 — Wind in Clay, Iowa
Queue IDG948
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity249.6 MW
StateIowa
CountyClay
Point of interconnectionSheldon (Obrien County sub) 345kV
Requested (queue) date2008-01-15
Proposed in-service date
Operational date
Withdrawn date2014-10-15
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata