MISO Queue Project G957 — Wind in Emmet, Iowa

MISO Queue Project G957 — Wind in Emmet, Iowa is a 300.0 MW wind interconnection project in Emmet, Iowa with a current status of withdrawn. It is proposed to connect at Winnco Corner 161 Substation.

300.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G957 — Wind in Emmet, Iowa
Queue IDG957
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity300.0 MW
StateIowa
CountyEmmet
Point of interconnectionWinnco Corner 161 Substation
Requested (queue) date2008-01-23
Proposed in-service date2010-12-31
Operational date
Withdrawn date2012-07-26
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata