MISO Queue Project G958 — Wind in Kent, Michigan

MISO Queue Project G958 — Wind in Kent, Michigan is a 120.0 MW wind interconnection project in Kent, Michigan with a current status of withdrawn. It is proposed to connect at Kenowa 345kV Substation.

120.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G958 — Wind in Kent, Michigan
Queue IDG958
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity120.0 MW
StateMichigan
CountyKent
Point of interconnectionKenowa 345kV Substation
Requested (queue) date2009-05-15
Proposed in-service date2010-12-31
Operational date
Withdrawn date2010-08-04
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.