MISO Queue Project G976 — Wind in Johnson, Iowa
MISO Queue Project G976 — Wind in Johnson, Iowa is a 18.0 MW wind interconnection project in Johnson, Iowa with a current status of withdrawn. It is proposed to connect at Tap on 34.5 kV line, approximately 2 miles north of Alliant sub (West Branch 115 kV), along Oasis Rd.
Project facts
| Canonical name | MISO Queue Project G976 — Wind in Johnson, Iowa |
|---|---|
| Queue ID | G976 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 18.0 MW |
| State | Iowa |
| County | Johnson |
| Point of interconnection | Tap on 34.5 kV line, approximately 2 miles north of Alliant sub (West Branch 115 kV), along Oasis Rd |
| Requested (queue) date | 2010-06-16 |
| Proposed in-service date | 2010-10-01 |
| Operational date | — |
| Withdrawn date | 2012-07-05 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.