MISO Queue Project G985 — Wind in Fayette, Iowa

MISO Queue Project G985 — Wind in Fayette, Iowa is a 200.0 MW wind interconnection project in Fayette, Iowa with a current status of withdrawn. It is proposed to connect at Hazelton - Windsor 161 kV.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G985 — Wind in Fayette, Iowa
Queue IDG985
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateIowa
CountyFayette
Point of interconnectionHazelton - Windsor 161 kV
Requested (queue) date2008-03-18
Proposed in-service date2008-11-01
Operational date
Withdrawn date2010-12-28
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata