MISO Queue Project H021 — Wind in Grundy, Iowa

MISO Queue Project H021 — Wind in Grundy, Iowa is a 138.6 MW wind interconnection project in Grundy, Iowa with a current status of operational. It is proposed to connect at Wellsburg 115kV Substation.

138.6 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project H021 — Wind in Grundy, Iowa
Queue IDH021
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity138.6 MW
StateIowa
CountyGrundy
Point of interconnectionWellsburg 115kV Substation
Requested (queue) date2008-05-01
Proposed in-service date2010-12-31
Operational date2010-12-31
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata