MISO Queue Project H022 — Wind in Barnes, North Dakota

MISO Queue Project H022 — Wind in Barnes, North Dakota is a 33.0 MW wind interconnection project in Barnes, North Dakota with a current status of withdrawn. It is proposed to connect at OTP Sanborn 41.6 kV Substation.

33.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project H022 — Wind in Barnes, North Dakota
Queue IDH022
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity33.0 MW
StateNorth Dakota
CountyBarnes
Point of interconnectionOTP Sanborn 41.6 kV Substation
Requested (queue) date2011-04-28
Proposed in-service date2012-12-01
Operational date
Withdrawn date2012-11-02
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata