MISO Queue Project H030 — Wind in Tuscola, Michigan

MISO Queue Project H030 — Wind in Tuscola, Michigan is a 200.0 MW wind interconnection project in Tuscola, Michigan with a current status of withdrawn. It is proposed to connect at Atlanta 120kV Substation.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project H030 — Wind in Tuscola, Michigan
Queue IDH030
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateMichigan
CountyTuscola
Point of interconnectionAtlanta 120kV Substation
Requested (queue) date2009-09-21
Proposed in-service date2014-10-01
Operational date
Withdrawn date2010-12-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.