MISO Queue Project H038 — Wind in Putnam, Missouri

MISO Queue Project H038 — Wind in Putnam, Missouri is a 200.0 MW wind interconnection project in Putnam, Missouri with a current status of withdrawn. It is proposed to connect at Approx. 20 miles N of Adair Sbstn on Ameren's 161 kV transm. System in Schuyler Cty, MO.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project H038 — Wind in Putnam, Missouri
Queue IDH038
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateMissouri
CountyPutnam
Point of interconnectionApprox. 20 miles N of Adair Sbstn on Ameren's 161 kV transm. System in Schuyler Cty, MO
Requested (queue) date2008-06-03
Proposed in-service date2010-08-01
Operational date
Withdrawn date2010-02-19
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.