MISO Queue Project H038 — Wind in Putnam, Missouri
MISO Queue Project H038 — Wind in Putnam, Missouri is a 200.0 MW wind interconnection project in Putnam, Missouri with a current status of withdrawn. It is proposed to connect at Approx. 20 miles N of Adair Sbstn on Ameren's 161 kV transm. System in Schuyler Cty, MO.
Project facts
| Canonical name | MISO Queue Project H038 — Wind in Putnam, Missouri |
|---|---|
| Queue ID | H038 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Missouri |
| County | Putnam |
| Point of interconnection | Approx. 20 miles N of Adair Sbstn on Ameren's 161 kV transm. System in Schuyler Cty, MO |
| Requested (queue) date | 2008-06-03 |
| Proposed in-service date | 2010-08-01 |
| Operational date | — |
| Withdrawn date | 2010-02-19 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata