MISO Queue Project J074 — Wind in Huron, Michigan

MISO Queue Project J074 — Wind in Huron, Michigan is a 350.0 MW wind interconnection project in Huron, Michigan with a current status of withdrawn. It is proposed to connect at Harbor Beach - Wyatt 120 kV.

350.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J074 — Wind in Huron, Michigan
Queue IDJ074
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity350.0 MW
StateMichigan
CountyHuron
Point of interconnectionHarbor Beach - Wyatt 120 kV
Requested (queue) date2009-10-05
Proposed in-service date2012-10-01
Operational date
Withdrawn date2012-03-13
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata