MISO Queue Project J082 — Wind in Mercer, North Dakota

MISO Queue Project J082 — Wind in Mercer, North Dakota is a 100.0 MW wind interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at Coyote - Green River 100-161 kV.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J082 — Wind in Mercer, North Dakota
Queue IDJ082
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionCoyote - Green River 100-161 kV
Requested (queue) date2009-10-05
Proposed in-service date2013-06-01
Operational date
Withdrawn date2011-09-19
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.